CBS Ltd were contracted through CVU to dry dock and refurbish Transport for London asset Greenwich Pier. Works included sand blasting and painting pontoons as well as replacing anodes and safety chains to prolong the life of the Pier.
Works took place through challenging winter months, in two phases to maintain operation at all times for river users.

This is one of many schemes carried out on behalf of TfL as CBS carry out both planned and reactive works across the London river network.